Parametric design it’s the tool we’ll use in order to design or re-design your project from sustainable strategies. From conceptual analysis to detailed, we’ll focus on the main goals of the project and we’ll give it life

If you want to know in an efficient way how much energy will use the building based on consuption patterns, or to compare two bills of quantities for two different versions of one project, or to know the budget items that can be optimized without changing the essence of the project…from a BIM model…Just ask us.

From a BIM model, by parameterization of constructive components, adding execution on site temporary systems and breaking down by execution phases, by linking that model with a execution planning, we’ll obtain a constructive simulation and we’ll be able to detect big problems early, avoiding economic losses and wasted time in execution progress, otherwise, with traditional techniques, we couldn’t have been avoided.

Show the project to the client determines his/her opinion in a secure way, on time. At the same time, 3d modelling contains much more information that many time we hope, how to show the information from your project is art for us.

Decide on the direction of the design by experimenting, iterating by skteching not only 2d plans. Let’s recover the design essence developing THE IDEA. The principle objective during this phase is to make decisions that will provide secure direction to the entire design process, and to compile a list of deliverables to produce.

Identify the requirements of the project, existing conditions, and unearth any essential information that will inform the design process. Common activities include preparing a functional program, conducting a site analysis, inventorying local code requirements, and to prepare a BIM Execution Plan which will guide all agents involved in the project.

BIM6D DIMENSIONS

 

Although there is not a direct corrrespondence between level of development (LOD) or the project progress timeline, there is an advantage by following a continuous sequence acrros dimensions. The ideal (and unreal) of any project is to not be neccesary to RE-DESIGN the project. These step can be significantly lowered if performance tasks are included on early stages.

Recent Projects

View Portfolio
JOSEP PEREZ Y XAVIER PIÑANA, ARCHITECTS
2D, 3D
HOSPITAL EXTENSION IN SABADELL
---
2D, 3D
VR BIM EQUIPMENT APP
1D, 2D
BIM DATA MANAGEMENT
--
3D
BIM TO GAMING
BGD. Barcelona Global Design
1D, 2D, 3D
HOSPITAL IN CHILE